See the software at work
Pick a product to see the screen your team will use every day. When you are ready, we show it to you live on your own projects, over WhatsApp or in your office.
BuildviaSample data
BuildviaAl Noor Contracting LLC
DashboardProjectsProcurementSubcontractsSite and DPRAccounts and VATHR and payrollPlantReportsLPO approvalsProcurement, all projects
ExportNew LPO
6Waiting for your approval
AED 1.84MOrdered this month
1.6 daysAverage approval time
| LPO | Supplier | Items | AED | Stage |
|---|---|---|---|---|
| LPO-0418 | Emirates Steel Trading | Rebar T16, 42 t | 126,000 | Operations |
| LPO-0419 | Gulf Readymix | C40 concrete, 310 m3 | 98,580 | Purchase |
| LPO-0420 | Al Falak Blocks | Hollow block 20 cm | 61,200 | Accounts |
| LPO-0421 | Delta Scaffolding | Hire, 3 months | 44,700 | MD |
| LPO-0422 | National Paints | Primer and emulsion | 27,350 | Approved |
| LPO-0423 | Speedway Electricals | LV cable, 4 drums | 83,900 | Operations |
| LPO-0424 | Prime Waterproofing | Membrane, 1,200 m2 | 39,600 | Purchase |
LPO-0418 approval chain
Purchase ManagerApproved 11 Nov, 3 quotes compared
Operations ManagerWaiting since 12 Nov
AccountsSets payment terms
Managing DirectorFinal release
Supplier quote attached. Lowest of 3, spec matches BOQ line 3.2.4.
ApproveReturn
Buildvia OneSunrise MEP Contracting
TodaySite diaryAttendanceStockPurchase ordersPDC chequesAccounts and VATSite diary, 13 Nov 2026RB26 Residential, Al Furjan
PrintSave diary
87Workers on site
6Activities progressed
AED 92KCheques due in 7 days
Manpower by trade
| Trade | Own | Supply | Total | Area |
|---|---|---|---|---|
| Plumbers | 12 | 4 | 16 | Levels 3 to 5 |
| Electricians | 18 | 6 | 24 | Level 5, first fix |
| Duct fitters | 8 | 0 | 8 | Level 4 corridor |
| Helpers | 22 | 14 | 36 | All floors |
| Foremen | 3 | 0 | 3 |
Work done
Level 5 conduit first fix completed
Level 3 water supply pressure test passed
Level 4 ducting 60 percent installed
Level 3 water supply pressure test passed
Level 4 ducting 60 percent installed
Cheques due this week
| 000214 Gulf Pipes | 18,500 16 Nov |
| 000215 Rent, camp | 42,000 18 Nov |
| 000216 Cable World | 31,700 19 Nov |
Bank balance covers all three.
LandoraSunrise Real Estate
PortfolioCash flowIPCsEscrow billingProgramme and delaySubmittalsAuthoritiesSales and handoverEscrow progress, Tower BDLD Form 2, level-wise
Excel with formulasPrepare release
AED 142.6MCertified to date
AED 38.2MEscrow balance
AED 9.4MClaimable at next release
| Element | Weight | Progress | Weighted |
|---|---|---|---|
| Enabling works | 3% | 100% | 3.0% |
| Substructure | 12% | 100% | 12.0% |
| Superstructure | 28% | 86% | 24.1% |
| Blockwork | 9% | 62% | 5.6% |
| MEP first fix | 14% | 41% | 5.7% |
| Finishes | 22% | 8% | 1.8% |
| External works | 7% | 0% | 0.0% |
| Handover | 5% | 0% | 0.0% |
| Total | 100% | 52.2% |
Reminders
Apply for 50% structure releaseDue in 9 days
DM inspection, Level 12 slab3 of 4 prerequisites done
Contractor IPC 14 to certifyReceived 10 Nov
Forecast completion is 18 days later than baseline. Driving path: Level 14 to 16 slabs.
JVC Residence G+7, Update 07Data date 13 Nov 2026, baseline BL1 active
Voice updateEOTSchedule
ActivityDays
Substructure58
Excavation and shoring24
Raft foundation Part A18
Raft foundation Part B16
Superstructure165
Ground floor slab18
Typical floors 1 to 464
Typical floors 5 to 748
Roof slab14
Finishes and MEP120
Blockwork Level 1 to 440
MEP first fix55
Plaster and screed50
Structure complete0
JulAugSepOctNovDecJanFebMar
Critical Remaining Baseline BL1Overall 62.4% complete, SPI 0.97
Programme review, Update 07 against Update 06Read only. The contractor file is never changed.
CommentsReview pack
DCMA 14-point assessment
| Check | Limit | Result | Status |
|---|---|---|---|
| Missing logic | 5% | 3.2% | Pass |
| Leads | 0 | 0 | Pass |
| Lags | 5% | 7.8% | Fail |
| Finish to start links | 90% | 93% | Pass |
| Hard constraints | 5% | 2.1% | Pass |
| High float | 5% | 4.4% | Pass |
| Negative float | 0 | 0 | Pass |
| High duration | 5% | 3.9% | Pass |
| Missed activities | 5% | 6.1% | Review |
| Critical path test | Passed | Pass | |
| CPLI | 0.95 | 0.98 | Pass |
| BEI | 0.95 | 0.94 | Review |
Changed since Update 06
| Logic changes | 37 |
| Duration changes | 12 |
| Calendar changes | 4 |
| Completion date | +18 days |
Longest path now runs through
Typical floors 5 to 7
Roof slab
MEP risers
Testing and commissioning
Roof slab
MEP risers
Testing and commissioning
3 removed links on the path need the contractor's explanation.
RemindraToday, 3 to do
Call Ahmed about steel delivery10:00, site
Send IPC 7 to the consultant12:30, follow up on WhatsApp
Site walk, Level 516:00
Spendrix, NovemberAED 6,240 spent
Credit card due 18 NovAED 3,420, reminder set
Cheque 000214 clears 20 NovAED 5,000
Fuel this monthAED 640, 8% less than October
GroceriesAED 1,180
In development
These grow out of the products above and the projects we work on. Ask to be told when one is ready, or tell us what your company needs.
Infrastructure ERPRoads, water and sewer networks, treatment plants and outfalls, tracked by chainage.Tell me when ready
Contracts and claimsReads your contract, watches every notice time-bar and builds the claim file.Tell me when ready
Fabrication ERPSteel, aluminium, precast and joinery shops, from cutting list to delivery on site.Tell me when ready
Gulf HR and payrollVisas, WPS, gratuity and labour camps for construction workforces.Tell me when ready
Facility managementDefects liability, planned maintenance and tenant requests after handover.Tell me when ready
DetailixIFC drawings in, shop drawings out in AutoCAD and PDF.Tell me when ready
DeltrixCompares tender drawings, IFC drawings and the BOQ, and lists every likely variation.Tell me when ready
DelegatoAn assistant for owners and directors that drafts mails and follow-ups and sends them on time.Tell me when ready
Not sure which one fits?
Tell us how your company works and we will show you the right product on your own data.