See the software at work

Pick a product to see the screen your team will use every day. When you are ready, we show it to you live on your own projects, over WhatsApp or in your office.



BuildviaSample data

LPO approvalsProcurement, all projects

ExportNew LPO
6Waiting for your approval
AED 1.84MOrdered this month
1.6 daysAverage approval time
LPOSupplierItemsAEDStage
LPO-0418Emirates Steel TradingRebar T16, 42 t126,000
LPO-0419Gulf ReadymixC40 concrete, 310 m398,580Purchase
LPO-0420Al Falak BlocksHollow block 20 cm61,200Accounts
LPO-0421Delta ScaffoldingHire, 3 months44,700MD
LPO-0422National PaintsPrimer and emulsion27,350Approved
LPO-0423Speedway ElectricalsLV cable, 4 drums83,900
LPO-0424Prime WaterproofingMembrane, 1,200 m239,600Purchase
LPO-0418 approval chain
Purchase ManagerApproved 11 Nov, 3 quotes compared
Operations ManagerWaiting since 12 Nov
AccountsSets payment terms
Managing DirectorFinal release
Supplier quote attached. Lowest of 3, spec matches BOQ line 3.2.4.
ApproveReturn

Site diary, 13 Nov 2026RB26 Residential, Al Furjan

PrintSave diary
87Workers on site
6Activities progressed
AED 92KCheques due in 7 days
Manpower by trade
TradeOwnSupplyTotalArea
Plumbers12416Levels 3 to 5
Electricians18624Level 5, first fix
Duct fitters808Level 4 corridor
Helpers221436All floors
Foremen303
Work done
Level 5 conduit first fix completed
Level 3 water supply pressure test passed
Level 4 ducting 60 percent installed
Cheques due this week
000214
Gulf Pipes
18,500
16 Nov
000215
Rent, camp
42,000
18 Nov
000216
Cable World
31,700
19 Nov
Bank balance covers all three.

Escrow progress, Tower BDLD Form 2, level-wise

Excel with formulasPrepare release
AED 142.6MCertified to date
AED 38.2MEscrow balance
AED 9.4MClaimable at next release
ElementWeightProgressWeighted
Enabling works3% 100%3.0%
Substructure12% 100%12.0%
Superstructure28% 86%24.1%
Blockwork9% 62%5.6%
MEP first fix14% 41%5.7%
Finishes22% 8%1.8%
External works7% 0%0.0%
Handover5% 0%0.0%
Total100%52.2%
Reminders
Apply for 50% structure releaseDue in 9 days
DM inspection, Level 12 slab3 of 4 prerequisites done
Contractor IPC 14 to certifyReceived 10 Nov
Forecast completion is 18 days later than baseline. Driving path: Level 14 to 16 slabs.

JVC Residence G+7, Update 07Data date 13 Nov 2026, baseline BL1 active

Voice updateEOTSchedule
ActivityDays
Substructure58
Excavation and shoring24
Raft foundation Part A18
Raft foundation Part B16
Superstructure165
Ground floor slab18
Typical floors 1 to 464
Typical floors 5 to 748
Roof slab14
Finishes and MEP120
Blockwork Level 1 to 440
MEP first fix55
Plaster and screed50
Structure complete0
JulAugSepOctNovDecJanFebMar
Critical Remaining Baseline BL1Overall 62.4% complete, SPI 0.97

Programme review, Update 07 against Update 06Read only. The contractor file is never changed.

CommentsReview pack
DCMA 14-point assessment
CheckLimitResultStatus
Missing logic5%3.2%Pass
Leads00Pass
Lags5%7.8%Fail
Finish to start links90%93%Pass
Hard constraints5%2.1%Pass
High float5%4.4%Pass
Negative float00Pass
High duration5%3.9%Pass
Missed activities5%6.1%
Critical path testPassedPass
CPLI0.950.98Pass
BEI0.950.94
Changed since Update 06
Logic changes37
Duration changes12
Calendar changes4
Completion date+18 days
Longest path now runs through
Typical floors 5 to 7
Roof slab
MEP risers
Testing and commissioning
3 removed links on the path need the contractor's explanation.
RemindraToday, 3 to do
Call Ahmed about steel delivery10:00, site
Send IPC 7 to the consultant12:30, follow up on WhatsApp
Site walk, Level 516:00
Spendrix, NovemberAED 6,240 spent
Credit card due 18 NovAED 3,420, reminder set
Cheque 000214 clears 20 NovAED 5,000
Fuel this monthAED 640, 8% less than October
GroceriesAED 1,180

In development

These grow out of the products above and the projects we work on. Ask to be told when one is ready, or tell us what your company needs.

Infrastructure ERPRoads, water and sewer networks, treatment plants and outfalls, tracked by chainage.Tell me when ready
Contracts and claimsReads your contract, watches every notice time-bar and builds the claim file.Tell me when ready
Fabrication ERPSteel, aluminium, precast and joinery shops, from cutting list to delivery on site.Tell me when ready
Gulf HR and payrollVisas, WPS, gratuity and labour camps for construction workforces.Tell me when ready
Facility managementDefects liability, planned maintenance and tenant requests after handover.Tell me when ready
DetailixIFC drawings in, shop drawings out in AutoCAD and PDF.Tell me when ready
DeltrixCompares tender drawings, IFC drawings and the BOQ, and lists every likely variation.Tell me when ready
DelegatoAn assistant for owners and directors that drafts mails and follow-ups and sends them on time.Tell me when ready

Not sure which one fits?

Tell us how your company works and we will show you the right product on your own data.

Talk to us on WhatsApp